A project almost always goes wrong for the same reason: the contract didn't say precisely what is being built, in how long, for how much, and who is liable if something fails.
Six situations that reach the courts every year.
The contractor misses the deadlines, or has simply walked away.
Cracks, leaks or defects that compromise structural soundness.
Verbal change orders that nobody acknowledges afterwards.
Approved progress billings, retentions that never get released.
Work delivered, years waiting for payment, sometimes without a formal contract.
It halts the sale, complicates the survey and shifts liability.
Four stages. The first decides whether there is a case or whether to negotiate.
Scope, pricing method, milestones, retentions and records. That is where the risk allocation that was agreed lives.
A technical expert report with a date and images. A weak report sinks a case that is right on the merits.
Compelled performance, calling the bond, termination with damages, or finishing with a third party.
Each path has prior requirements, and skipping them is the most common reason for dismissal.
Almost everything in law has a deadline, and yours is already running
Tell us what happened. We'll tell you which path applies and what to do right away, at no cost.
None of this is required for the first conversation. The more you have, the sooner we can tell you whether there is a case.
With its annexes: plans and specifications.
It marks the start of the warranties.
Receipts, transfers, approved progress billings.
Of the defect, and of how it looked before, if you have them.
Emails, messages and change orders.
That works too. We start with the project.
That works too. With the project's address and approximate dates we start rebuilding the file.
Misidentifying who is liable is as costly as arriving late.
The Dominican Civil Code makes the builder and the architect liable for the total or partial collapse of the work and for defects that compromise its soundness, with a warranty period counted from acceptance that is considerably longer than most owners assume.
Documenting the defect when it appears, with a date and images, is worth more than any argument made later. And signing the acceptance certificate without reservations closes claims that were still open.
years leading the firm
cases handled since 2008
practice areas with their own case files
on Google, across 500 reviews
At a minimum: identification of the parties, scope with plans and specifications attached, price and pricing method, form and schedule of payment, deadline with milestones and penalties, retentions and bonds, a procedure for change orders, permit obligations, acceptance conditions and warranties, and the dispute resolution mechanism. A contract that leaves out change orders and acceptance leaves the two most expensive arguments open.
Document them immediately with a date, photographs and, if possible, a technical report; formally notify the builder; and check where the warranty period stands. The most common mistake is complaining only verbally for months: by the time you decide to act, there is no record of anything and the deadline has moved on.
It depends on the nature of the defect. Defects affecting soundness or compromising the structure carry a long warranty period counted from acceptance of the work; other, minor defects are governed by shorter periods and by what the contract itself agreed. Determining which category the specific problem falls into is the first step of the evaluation.
Yes, although the path differs from collecting between private parties and requires rebuilding the proof of performance and of acceptance. The absence of a formal contract makes the case harder but does not always prevent it. What matters is acting before the administrative deadlines run out.
The mirror-image problem is litigated the same way: with the documentation accumulated during the project. Approved progress billings, records, correspondence and change orders are what prove the work performed. Extensions ordered verbally and later denied are the usual weak point, which is why they should be put in writing while the relationship is still good.
Describe it in your own words. You don't need to know the legal term or have every document. Within 24 hours you will hear back on the options that apply and the deadlines that are running.